Decision letter and Inspector’s Report for a recovered appeal for the construction and operation of 16 wind turbines with a maximum height to the tip of the blade of 115 meters (above ground level) for a temporary period of 25 years.
A decision on this case was issued on 6 July 2017.
seen at 16:33, 13 February in Publications on GOV.UK.Email this to a friend.