Decision letter and Inspector’s Report for a recovered appeal for the construction and operation of 16 wind turbines with a maximum height to the tip of the blade of 115 meters (above ground level) for a temporary period of 25 years.
A decision on this case was issued on 6 July 2017.
Local copy of 18-02-13_DL_IR_Scout_Moor_Wind_Farm.pdf seen at 14:33, 13 February in Publications on GOV.UK.
Email this to a friend.