The Government are aware of the concerns that have been expressed by the London borough of Tower Hamlets and others in the borough about the impacts of Crossrail in Tower Hamlets. Many of those concerns centre on the works proposed in the Bill in and around Hanbury street to use a site for launching tunnel boring machines and associated works at Pedley street and Mile End Park for removal of excavated material.After many months of detailed work with Cross London Rail Links (CLRL) and Transport for London, a solution has been identified that should significantly reduce the implications of Crossrail works for the local community.The work carried out by CLRL has involved a fundamental review of its tunnelling strategy. CLRL has concluded that by a major recasting of the construction programme it is possible to accommodate the major part of the tunnelling activities from the two tunnel boring machine launch sites already proposed at Royal Oak in west London and between Canary Wharf and Custom House in the Docklands area of east London. As a result Crossrail would not need to launch tunnel boring machines from Hanbury Street in east London.The new tunnelling strategy will significantly reduce the environmental impacts of Crossrail construction in the borough of Tower Hamlets, and we believe they would be positive overall for London. There would be no need for the works between Hanbury street and Pedley street or the conveyor along the Great Eastern main line. Mile End Park would not be needed as a site for stockpiling excavated material. A shaft will still need to be constructed at Hanbury street for ventilation and intervention, but this will be a much smaller structure involving less work and so reducing disruption to the local community. I have asked CLRL urgently to consider these residual impacts so that they can be further ameliorated. An environmental assessment of the alternative strategy will be published in due course.LRL's assessment is that constructing the central Crossrail tunnel in this new way will not increase overall the project's programme or budget.LRL will in due course write to all affected petitioners setting out the details of the alternative tunnelling strategy and the implications for Hanbury street. This will happen in good time for hearings on these issues in the Bill Select Committee.
http://www.theyworkforyou.com/wms/?id=2006-03-30a.101WS.2
seen at 09:23, 31 March in Written Ministerial Statements.