Decision: Galloper wind farm – Variation 3

On 24 May 2013, the Secretary of State for Energy and Climate Change granted a development consent order (DCO) for Galloper wind farm. The pre-application, examination and DCO documents can be found on the Planning Inspectorate’s website.

The DCO authorises Galloper wind farm limited to construct and operate an offshore generating station up to a maximum capacity of 504MW, situated about 27 kilometres off the south-east coast of Suffolk, in the Outer Thames Estuary. The development will comprise of up to:

140 wind turbine generators 3 meteorological masts 4 offshore platforms 3 export cables

On 13 January 2014, MMO received a request from Galloper wind farm limited to vary the deemed marine licence contained within schedule 2 of the Galloper wind farm Order 2013. MMO’s decision was to vary the deemed marine licence, effective from 3 April 2014.

On 3 February 2015 the MMO received a request from Galloper Wind Farm Ltd to vary the Deemed Marine Licence (DML) contained within Schedule 2 the Galloper Wind Farm Order 2013 to increase maximum monopile diameter from 7 to 7.5 metres. MMO’s decision was to vary the DML, effective from 17 September 2015.

In June 2016, the MMO imposed variations to the Deemed Marine Licence (DML) contained within Schedule 2 the Galloper Wind Farm Order 2013, to update existing navigation conditions to reflect the MMO’s agreed standard conditions and to add a requirement to agree a fisheries liaison and coexistence plan.


Local copy of Galloper_wind_farm_notice_of_variation.pdf
Local copy of Galloper_wind_farm_deemed_licence.pdf

https://www.gov.uk/government/publications/galloper-wind-farm-variation-3

seen at 14:32, 1 July in Publications on GOV.UK.